Cooper, Iowa

Cooper, Iowa

Cooper, Iowa

ABOUT THIS FABRIC STRUCTURE

Greenfield Contractors constructed this dry fertilizer storage building for New Cooperative. When designing and installing this fabric structure, our team took on the challenge of taking into consideration obstacles including anhydrous ammonium bullet, water well, property line, and an existing blending tower.

Features
  • 10,000 ton dry fertilizer storage
  • 4 storage bins
  • Exterior blending tower with interior floor dump
  • 16 foot tall poured concrete walls
INDUSTRY

Fertilizer

Size

140 X 180

LOCATION

Cooper, Iowa

YEAR

2022

Building Your Future